Calculation of SAM/SMV:



Step 1: Select one operation for which you want to calculate SAM.

Step 2: Capture cycle time for that operation by stop watch standing beside of the operator. (cycle time: total time taken to do all works needed to complete one operation). Do time study for consecutive five cycles. Calculate average of the 5 cycles. Time we get from time study is called cycle time.
Basic Time = Cycle Time X Performance rating

* Performance rating: Performance rating means at what performance level operator doing the job, considering his movement and work speed. Suppose that operator performance rating is 80%. Suppose cycle time is 0.60 minutes. Basic time = (0.60 X 80%) = 0.48 minutes

Step 3: Standard allowed minutes (SAM) = (Basic minute + Bundle allowances + machine and personal allowances). Add bundle allowances (10%) and machine and personal allowances (20%) to basic time. Now we get Standard Minute value (SMV) or SAM. SAM= (0.48+0.048+0.096) = 0.624 minutes.

OPERATION BREAKDOWN AND SMV
Name of Operation
M/C name
SMV
Manpower
Placket Iron
IRON
0.40
2
Placket Join Position Mark
TABLE
0.30
1
Placket Join
1N2TLS
0.32
2
Placket Front Middle Cut
TABLE
0.28
1
Rib Placket Servicing
O/L
0.25
1
Lower Placket 2 Part Join
1N2TLS
0.30
1
Lower Placket O/L
2N4TOL
0.28
1
Lower Placket Join & Top Stitch
1N2TLS
0.32
2
Nose Tack
1N2TLS
0.35
1
Back & Front Part Matching
TABLE
0.30
1
Shoulder Joint & Trim
2N4TOL
0.33
1
Collar Servicing & Mark
O/L
0.30
1
Collar Tack to Neck
1N2TLS
0.40
2
Collar Join
2N4TOL
0.32
1
Collar Piping
1N2TFL
0.30
1
Collar Top Stitch
1N2TLS
0.60
2
Placket Close & 1/16 T/S
1N2TLS
0.71
3
Placket Inner Tack
1N2TLS
0.35
1
Placket Corner Cut
TABLE
0.25
1
Placket Box Make
1N2TLS
0.50
2
Cuff Servicing
O/L
0.25
1
Cuff Join
2N4TOL
0.40
1
Sleeve Matching
TABLE
0.30
1
Sleeve Join
2N4TOL
0.43
2
Arm Hole Top Stitch
2N3TFL
0.45
1
Cuff Opening Tack
1N2TLS
0.30
1
Sticker Remove+ Body Turn
TABLE
0.20
1
Side Seam
2N4TOL
0.50
2
Cuff Top Tack
1N2TLS
0.22
1
Bottom Hem
2N3TFL
0.24
1
Button Hole
1N2TBH
0.25
1
Button attach With Mark
1N2TBA
0.40
1
Label  Make & Bottom Security Tack
1N2TLS
0.43
2
Total

11.53
44

Sewing Thread Consumption:
Sewing thread requirement 3.44 M for machine code 1N2TLS means to Stitch 1 Meter of Seam, 3.44 meter sewing thread is used.
Here we need to consider operational allowance 3+3=6 cm (starting point+ ending point) for each operation for Lock Stitch and 3.5+3.5= 7 cm for chain stitch , 5+5=10 cm for Flat lock , 6+6=12 cm for over lock with the length of each operation.
Also we need to consider 10-15% wastage on the calculated sewing thread consumption.

SEWING THREAD CONSUMPTION
M/C Name
CODE
Required Thread(M/M)
Single Needle Lock Stitch
1N2TLS
3.44
Single Needle 2 Thread Flat Lock
1N2TFL
4.8
Double Needle 3 Thread Flat Lock
2N3TFL
13.2
Double Needle 4 Thread Over lock
2N4TOL
19.8
Without Needle Over lock M/C
O/L
0
Button Attach
1N2TBA
0.3
Button Hole
1N2TBH
0.95

6 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. HOW ABOUT POLO TEE WITH POCKET AND VENT ON SIDES?

    ReplyDelete
  3. আমি আপনার লাইন সাজানো দেখে খুব খুশি

    ReplyDelete